Intermountain Gas 240402 Nampa Construction
IPUC Construction Inspection Inspector(s): Perkins 1 Date(s): 04/02/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: Raytown Ln/Weldstone, Sunnyvale sub City/District: Nampa division _ Contractor/Job#: Foreman: Employees: See Job List 371-3348 German Gomez Job Description: Install 2" main System Type: ® Distribution ❑ Transmission Operator Supervisor: Mingo One-Call Ticket: 2024131600 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Bedding with sand SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification N/A OPS 501 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandomnent N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pine N/A OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 2"main line(backbone) in Nampa, ID. Address: Raytown Ln/Weldstone, Sunnyvale subdivision Observations Include: Correct trench depth, safety equipment,pot-holing, verification of OQ records, tracer wire, bedding with sand and backfill. Quizzed personnel on separation of gas lines from other utilities. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): ,�'" �-• i Perkins Date: 04/02/2024 Reviewer: Date: Brooks IPUC Form 4 Rev. 12/21/2023