Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 240325 Twin Falls Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 03/25/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 1614/1596/1608 Kenyon Meadows St City/District: Twin Falls Contractor/Job#: Foreman: Employees: See Job List 21686-583, 21685-583, Jeffery Grant Job Description: Install 3/4" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: N/A One-Call Ticket: 2024122463, 2024122459, On-Site: N 2024122457 Total Inspection Days: 1.0 Tasks: Rating Critical Procedure_#_ Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 l SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type _SAT OPS 505 100 PSI for 15 Min 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping SAT OPS 600 13. Meter Location/Re lator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 All dates in the folder 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT j SF 418 SF 422 19. Abandonment N/A OPS 607 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 20. Line Locating SAT OPS 611 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed KV-Utilities, a contractor for IGC Install 3/4" service line(s) in Twin Falls, ID. Address: 1614/1596/1608 Kenyon Meadows St Observations Include: Correct trench depth, safety equipment, verification of OQ records, verification of equipment calibrations, stab fittings, tracer wire, successful pressure test, EFV 1200 installation, bedded with dirt from excavation and backfill. Quizzed personnel on squeeze times and trench depths. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes 7N oT X Follow-up Required: By Date: Yes No X Inspector(lead): Date: 03/29/2024 Perkins Reviewer: Date: Brooks P U Ci Form 4 Rev. 12/21/2023