Loading...
HomeMy WebLinkAboutIntermountain Gas 240323-25 Pocatello Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 07/23-25/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: 1357 E Clark St (Pocatello) City/District: Pocatello Contractor/Job #: Foreman: Employees: See Job List 679-57FS-009 Robert Wilson Job Description: Install '/" service line System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024290550 On-Site: N Total Inspection Days: 2.5 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 100' Bore, pull back OPS 322 1 I/2" sleeve 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 _ OPS 322 5 Valve Installation N/A OPS 703 6. Coating Condition SAT OPS 401 Tar coating OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 98 PSI for 15 Min(3/4") 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping SAT OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 All dates in the folder 15. EFV Installation SAT OPS 301 EFV 1200 3/4" 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 I P U C Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 Stab fitting, EFV install, - Joiner(s) Qualified OPS 309 installing 3/" PE into - Fusion Tools OPS 324 1 %2"plastic sleeve - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe SAT OPS 200 Tapping tee, collecting - Welder(s) Qualified OPS 201 pipe coating, wrapping Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: -Inspector Perkins traveled to Pocatello district for field audit and observed KV-Utilities a contractor for IGC performing new construction. -1357 E Clark St (Pocatello)-Observations Included: pot-holing, trenching, boring, stab fittings, pressure test, installing 100' plastic sleeve, tracer wire, installing anode, bedding, back filling, patching asphalt, welding on 3/" tapping tee off 2"main, tape wrapping, collecting pipe coating, safety equipment, verification of OQ records, verification of equipment calibrations, EFV 1200 installation. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. (2.0) -Traveled back to Boise and completed paperwork. (.5) Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): a Date: 7/25/2024 Perkins Reviewer: Date: Brooks �- ��'a`I IPUC Form 4 Rev. 12/21/2023