HomeMy WebLinkAboutIntermountain Gas 240323-25 Pocatello Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 07/23-25/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company(IGC)
Address: 1357 E Clark St (Pocatello) City/District: Pocatello
Contractor/Job #: Foreman: Employees: See Job List
679-57FS-009 Robert Wilson
Job Description: Install '/" service line System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024290550
On-Site: N
Total Inspection Days: 2.5
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308 100' Bore, pull back
OPS 322 1 I/2" sleeve
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
_ OPS 322
5 Valve Installation N/A OPS 703
6. Coating Condition SAT OPS 401 Tar coating
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 98 PSI for 15 Min(3/4")
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping SAT OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 All dates in the folder
15. EFV Installation SAT OPS 301 EFV 1200 3/4"
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Purge SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
I P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307 Stab fitting, EFV install,
- Joiner(s) Qualified OPS 309 installing 3/" PE into
- Fusion Tools OPS 324 1 %2"plastic sleeve
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe SAT OPS 200 Tapping tee, collecting
- Welder(s) Qualified OPS 201 pipe coating, wrapping
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
-Inspector Perkins traveled to Pocatello district for field audit and observed KV-Utilities a contractor for
IGC performing new construction.
-1357 E Clark St (Pocatello)-Observations Included: pot-holing, trenching, boring, stab fittings, pressure
test, installing 100' plastic sleeve, tracer wire, installing anode, bedding, back filling, patching asphalt,
welding on 3/" tapping tee off 2"main, tape wrapping, collecting pipe coating, safety equipment,
verification of OQ records, verification of equipment calibrations, EFV 1200 installation. All observed
procedures were followed in accordance with IGC Operations and Maintenance Manual. (2.0)
-Traveled back to Boise and completed paperwork. (.5)
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): a Date: 7/25/2024
Perkins
Reviewer:
Date:
Brooks �- ��'a`I