Intermountain Gas 240321 Meridian Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 03/21/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: S Eagle Road and E Columbia Road City/District: Meridian Contractor/Job #: Foreman: Employees: See Job List 2015-413 Kobi Voyson Job Description: Install 6" Main System Type: ® Distribution ❑ Transmission Operator Supervisor: Jason One-Call Ticket: 2024090284 On-Site: Y Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 Bore crew OPS 322 3. Bedding/Backfill SAT OPS 308 Sand used in trench bore SF 418 holes 4. Pipe Installation (Tracer Wire) SAT OPS 308 12 gauge bore wire OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation SAT OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Temp Gauge 10/2024 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I I OPS 607 20. Line Locating SAT I I OPS 611 Visible Locate Markings IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Das-Co a contractor for IGC install 6" main line(s) in Meridian, ID. Address: S Eagle Road and E Columbia Road, Meridian, ID Observations Include: Correct trench depth, boring depth was 18 feet deep with 11 feet of separation form Williams Pipeline,pull back with 4"PE weak link, safety equipment, traffic control, verification of OQ records, verification of equipment calibrations, tracer wire, bedding in bore holes, butt fusion of 12-inch sleeve pipe. All observed procedures were conducted in accordance with IGCs Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 03/21/2024 Galli -- Reviewer: Date: �Q Brooks IPUC Form 4 Rev. 12/21/2023