HomeMy WebLinkAboutIntermountain Gas 240307.1 Meridian Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 03/07/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: 5143 W Canaston St City/District: Meridian
Contractor/Job#: Foreman: Employees: In file
052180-371 Librado Ruiz
Job Description: Install 3/4" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024092452
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill UNSAT OPS 308 No separation between
SF 418 gas service line and
electrical conduit
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 94 PSI for 95 Min
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation UNSAT OPS 302 No separation between
gas service line and
electrical conduit
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 All dates in the folder
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
21. Plastic Pipe SAT OPS 307
-Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
-Joining Procedure OPS 800
- Squeeze
22. Steel Pine N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install a 3/4" Service Line in Meridian,
ID.
Address: 5143 W Canaston St
Observations Include: Safety equipment, trenching, verification of OQ records, UNSAT on back-filling,
locating all utilities, fusing,purging,pressure test, stab fittings and EFV install. Quizzed personnel on
squeeze times and fusion rest times. All procedures were followed in accordance with IGC Operations
and Maintenance Manual.
IGC contractor Das-Co installed service line over the top of electrical conduit and did not leave the
required 4" of separation.
Corrective Action Required: o1y O Yes X No
Follow-up Required: By Date: 03/21/2024 Yes X No
inspector (Lead): -y :" /, Date:
Perkins 02/26/2024
Reviewer:
Date:
Brooks
IPUC Form 4 Rev. 12/21/2023