Loading...
HomeMy WebLinkAboutIntermountain Gas 240306.2 Caldwell Construction IPUC Construction Inspection Inspector(s): Perkins, Galli Date(s): 03/06/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 1609 Lansing Ave City/District: Caldwell Contractor/Job#: Foreman: Employees: See Job List 050879-413 Bob Schwehrt Job Description: Install 3/4" Service Line(s) System Type: ® Distribution ❑ Transmission Operator Supervisor: Zach Williams One-Call Ticket: 2024 On-Site: N Total Inspection Days: 2.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Sand SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 95 PSI for 15 Min 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 All dates in the folder 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/2v2023 IPUC Construction Inspection 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 -Heat Plate OPS 325 -Joining Procedure OPS 800 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins and Galli observed an IGC crew repair a 1/2" service line(s) that was bored through a concrete sewer pipe in Caldwell, ID. Address: 1609 Lansing Ave, Caldwell, ID Observations Include: Correct trench depth, safety equipment, verification of OQ records, verification of equipment calibrations, tracer wire, successful pressure test, mechanical fittings (3/4 to 1/2 inch reducing continental stab fittings) and backfill. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes f No X Inspector(Lead): fig -, Date: 03/06/2024 Perkins Reviewer: Brooks / Date: 2-`7 a4 P U C Form 4 Rev. 12i21/2023