HomeMy WebLinkAboutIntermountain Gas 240227 Eagle Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 02/27/2024 -
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: 14501 N Whitefish Way, City/District: Eagle
14697 N Power Way
Contractor/Job #: Foreman: Employees: In file
116343-425 Rigo Chavarin
115326-425 Jose Maceda _
Job Description: Install 3/4" Service Lines System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024062286, 2024020985
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure # Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O &M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 PSI for 15 Min-Rigo
94 PSI for 15 Min-Jose
9. OQ Qualifications SAT OPS 800 In folder
10. Casio Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 All dates in the folder
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
_ OPS 1000
j17. Purge SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
IPUC Form 4 Re,. 12/21/2023
IPUC Construction Inspection
20. Line Locating SAT OPS 611
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
-Fusion Tools OPS 324
-Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor(Rigo) for IGC Install 3/4" Service Line in
Eagle, ID.
Address: 14501 N Whitefish Way
Observations Include: Safety equipment, trenching, verification of OQ records, back-filling, bedding,
locating all utilities, fusing, stab fittings and EFV install. Quizzed personnel on squeeze times and
fusion rest times. All procedures were followed in accordance with IGC Operations and Maintenance
Manual.
IPUC inspector Perkins observed Das-Co, a contractor(Jose) for IGC Install 3/4" Service Line in Eagle,
ID.
Address: 14697 N Power Way
Observations Include: Safety equipment, verification of OQ records, back-filling, bedding, locating all
utilities, fusing,purging-both addresses,pressure test-both addresses, stab fittings and EFV install.
Quizzed personnel on squeeze times and fusion rest times. All procedures were followed in accordance
with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): �' Date:
Perkins4x ! 02/27/2024
Reviewer:
v
Brooks Date: -act•��
P U C Form 4 Rev. 12/21/2023