Loading...
HomeMy WebLinkAboutIntermountain Gas 240227 Eagle Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 02/27/2024 - Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 14501 N Whitefish Way, City/District: Eagle 14697 N Power Way Contractor/Job #: Foreman: Employees: In file 116343-425 Rigo Chavarin 115326-425 Jose Maceda _ Job Description: Install 3/4" Service Lines System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024062286, 2024020985 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 PSI for 15 Min-Rigo 94 PSI for 15 Min-Jose 9. OQ Qualifications SAT OPS 800 In folder 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 All dates in the folder 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 _ OPS 1000 j17. Purge SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 IPUC Form 4 Re,. 12/21/2023 IPUC Construction Inspection 20. Line Locating SAT OPS 611 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 324 -Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor(Rigo) for IGC Install 3/4" Service Line in Eagle, ID. Address: 14501 N Whitefish Way Observations Include: Safety equipment, trenching, verification of OQ records, back-filling, bedding, locating all utilities, fusing, stab fittings and EFV install. Quizzed personnel on squeeze times and fusion rest times. All procedures were followed in accordance with IGC Operations and Maintenance Manual. IPUC inspector Perkins observed Das-Co, a contractor(Jose) for IGC Install 3/4" Service Line in Eagle, ID. Address: 14697 N Power Way Observations Include: Safety equipment, verification of OQ records, back-filling, bedding, locating all utilities, fusing,purging-both addresses,pressure test-both addresses, stab fittings and EFV install. Quizzed personnel on squeeze times and fusion rest times. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): �' Date: Perkins4x ! 02/27/2024 Reviewer: v Brooks Date: -act•�� P U C Form 4 Rev. 12/21/2023