HomeMy WebLinkAboutIntermountain Gas 240226 Nampa Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 02/26/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC)
Address: 10445/10457 Crystal Ridge Dr City/District: Nampa
Contractor/Job#: Foreman: Employees: Joel Gonzalez, Luis Queveda
048661-371, 048660-371 Dominic Greco
Job Description: Install 3/41' Service Lines System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024071595, 2024071593
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 98 PSI for 15 Min
9. OQ Qualifications SAT OPS 800 [ In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT I OPS 302
12. Tie-In/Hot Tapping N/A I OPS 600
13. Meter Location/Re lator Testing; N/A I OPS 302
14. Equipment Calibration Verification SAT OPS 501 All dates in the folder
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/4" Service Lines in Nampa, ID.
Address: 10445/10457 Crystal Ridge Dr
Observations Include: Safety equipment, trenching, verification of OQ records, back-filling, locating all
utilities, fusing, purging,pressure test, stab fittings and EFV install. Quizzed personnel on squeeze times
and fusion rest times. All procedures were followed in accordance with IGC Operations and
Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead): Date:
Perkins 02/26/2024
Reviewer:
Brooks Date:
IPUC Form 4 Rev. 12/21/2023