Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 240222 Meridian Construction
IPUC Construction Inspection Inspector(s): Brooks, Galli Date(s): 2-22-24 Company/Owner: Unit/OPID: 08160 Intermountain Gas Compare (y IGC) Address: 5102 N Brody Ave City/District: Meridian Contractor/Job#: Foreman: Employees: Ryan Enrico 413-1874 Michael Krebs Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: Joe One-Call Ticket: 052366 On-Site: N Total Inspection Days: 2 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Did not witness backfill SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 97 psi for 15 min 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Gauge Due 7-12-24, Pyrometer Due 1-9-25 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pine SAT OPS 307 Squeeze release not - Joiner(s) Qualified OPS 309 witnessed. - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspectors Brooks and Galli observed Das-Co, a contractor for IGC install a 3/4" service line in Meridian, ID. Address: 5102 N Brody Ave Observations Included: Excavation, trench depth, safety equipment, verification of OQs, equipment calibrations, tracer wire, plastic butt fusion, stab fittings, EFV 1200 installation, and pressure test. Quizzed employees on applicable AOCs of fusion procedures and squeeze time and squeeze release time. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 2/22/2024 Brooks Reviewer: Date: IPUC Form 4 Rev. 12/2v2023