Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 240221 Nampa Construction
IPUC Construction Inspection Inspector(s): Brooks Date(s): 2-21-24 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: 12872 and 12884 Towhee St City/District: Nampa Contractor/Job#: Foreman: Employees: Joel Gonzalez,Luis Tamayo Queveda, 317-1713 Dominic Greco Holly Weir Job Description: Install %1' Service Lines System Type: ® Distribution ❑ Transmission Operator Supervisor: Mingo One-Call Ticket: 072098, 072096 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure# _ Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 98 psi for 15 min 9. OQ Qualifications SAT OPS 800 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Gauge Due 1-8-25, Pyrometer Due 4-5-24 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12121/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Brooks observed Das-Co, a contractor for IGC install 3/4" service lines in Nampa, ID. Address: 12872 & 12884 Towhee St Observations Included: Excavation, trench depth, line locating, safety equipment, verification of OQ, equipment calibrations, tracer wire,plastic butt fusion, stab fittings, EFV 1200 installation, successful pressure test at 98 psi for 15 minutes, backfill and continuity testing. Quizzed employees on applicable AOCs of fusion procedures. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 2/22/2024 Brooks Reviewer: Date: IPUC Form 4 Rev. 12/21/2023