Loading...
HomeMy WebLinkAboutIntermountain Gas 240220-21&27 Garden City Construction IPUC Construction Inspection Inspector(s): Gatti,Brooks Date(s): 02/20-21&27/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 411 and 417 E Remington St City/District: Garden City Contractor/Job#: ' Foreman: Employees: See Job List 421-0642,421-06681, German Gomez 421-03251 421-86456 Job Description: Install 3/" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: Kyle/John One-Call Ticket: 070494, 070498, 070500 On-Site: Y Total Inspection Days: 3.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Sand used SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in folder 15. EFV Installation N/A OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 Observed Potholin IPUC Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure _ OPS 800 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli and Brooks observed Das-Co, a contractor for IGC install a 2"main and install 3/4" service line in Garden City, ID. Address: 411 & 417 E Remington St, Garden City, ID Feb 20-21, 2024 Observations Include: correct trench depth, line locating and potholing, safety equipment, verification of OQ records, verification of equipment calibrations, bedding with sand, tracer wire and boring. Quizzed employees on applicable AOCs of fusion procedures. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Feb 27, 2024 Observations Include: correct trench depth, line locating, safety equipment, bedding with sand and tracer wire. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: 2/27/2024 Gaiii Reviewer: Date: Brooks IPUC Form 4 Rev. 12/21/2023