HomeMy WebLinkAboutIntermountain Gas 240208 Meridian Construction I PU C Construction Inspection
Inspector(s): Perkins Date(s): 02/08/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company IGC)
Address: 6217 W Pewter Point St City/District: Meridian
Contractor/Job#: Foreman: Employees: Jordan Oakes, Gene Rapp
048965-371 Kyler Oakes
Job Description: Install 3/4" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: One-Call Ticket: 2024051578
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. BeddingBackfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 92 PSI for 15 Min
9. OQ Qualifications SAT OPS 800 In folder
10. Casio Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 All dates in the folder
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Purge SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
-Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pine N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/4" Service Line in Meridian,
ID.
Address: 6217 W Pewter Point St
Observations Include: Safety equipment, trenching, verification of OQ records, back-filling, locating all
utilities, fusing,purging,pressure test, stab fittings and EFV install. All procedures were followed in
accordance with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No 1 X
Follow-up Required: By Date: Yes No 1 X
Inspector (Lead): Date:
Perkin ,o 02/08/2024
Reviewer:
Date:
Brooks I
IPUC Form 4 Rev. 12/2v2023