HomeMy WebLinkAboutIntermountain Gas 240208 Meridian Construction I PU C Construction Inspection Inspector(s): Perkins Date(s): 02/08/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC) Address: 6217 W Pewter Point St City/District: Meridian Contractor/Job#: Foreman: Employees: Jordan Oakes, Gene Rapp 048965-371 Kyler Oakes Job Description: Install 3/4" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: One-Call Ticket: 2024051578 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. BeddingBackfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 92 PSI for 15 Min 9. OQ Qualifications SAT OPS 800 In folder 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 All dates in the folder 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 P U C Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pine SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 -Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC Install 3/4" Service Line in Meridian, ID. Address: 6217 W Pewter Point St Observations Include: Safety equipment, trenching, verification of OQ records, back-filling, locating all utilities, fusing,purging,pressure test, stab fittings and EFV install. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No 1 X Follow-up Required: By Date: Yes No 1 X Inspector (Lead): Date: Perkin ,o 02/08/2024 Reviewer: Date: Brooks I IPUC Form 4 Rev. 12/2v2023