HomeMy WebLinkAboutIntermountain Gas 240207 Boise Construction IPUC Construction Inspection Inspector(s): Galli,Brooks Date(s): 02/07/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company(IGC) Address: 5156 N Becker Ridge Lane City/District: Boise Contractor/Job#: Foreman: Employees: See Job List 111898-425 Jose Maceda Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: Jason One-Call Ticket: 060594 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 Sand not needed SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 min 9. OQ Qualifications SAT OPS 800 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot T in N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates in folder 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating N/A OPS 611 IPUC Form 4 Rev. 12/2112023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pine N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli and Brooks observed Das-Co, a contractor for IGC install a 3/" service line in Boise, ID. Address: 5156 N Becker Ridge Lane, Boise, Idaho Observations Include: correct trench depth, safety equipment, verification of OQ records, verification of equipment calibrations, tracer wire,butt fusion, EFV 1200 installation, successful pressure test at 96 psi for 15 minutes, stab fitting(T's and couplers), bedding and backfill and continuity testing. Quizzed employee on applicable ADCs of fusion and squeeze off procedures. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): Date: 2/7/2024 Galli Reviewer: Date: Brooks IPUC Form 4 Rev. 12/21/2023