HomeMy WebLinkAboutIntermountain Gas 240207 Boise Construction IPUC Construction Inspection
Inspector(s): Galli,Brooks Date(s): 02/07/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company(IGC)
Address: 5156 N Becker Ridge Lane City/District: Boise
Contractor/Job#: Foreman: Employees: See Job List
111898-425 Jose Maceda
Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: Jason One-Call Ticket: 060594
On-Site: N
Total Inspection Days: 1
Tasks: Rating Critical Procedure # Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308 Sand not needed
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 min
9. OQ Qualifications SAT OPS 800
10. Casio Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot T in N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Dates in folder
15. EFV Installation SAT OPS 301 EFV 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating N/A OPS 611
IPUC Form 4 Rev. 12/2112023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pine N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli and Brooks observed Das-Co, a contractor for IGC install a 3/" service line in
Boise, ID.
Address: 5156 N Becker Ridge Lane, Boise, Idaho
Observations Include: correct trench depth, safety equipment, verification of OQ records, verification of
equipment calibrations, tracer wire,butt fusion, EFV 1200 installation, successful pressure test at 96 psi
for 15 minutes, stab fitting(T's and couplers), bedding and backfill and continuity testing. Quizzed
employee on applicable ADCs of fusion and squeeze off procedures. All procedures were followed in
accordance with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead): Date: 2/7/2024
Galli
Reviewer:
Date:
Brooks
IPUC Form 4 Rev. 12/21/2023