HomeMy WebLinkAboutIntermountain Gas 240206 Boise Construction IPUC Construction Inspection
Inspector(s): Galli, Brooks Date(s): 02/06/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: 5316 W Wylie Lane City/District: Boise
Contractor/Job#: Foreman: Employees: See Job List
117874-425 Jesus Garcia
Job Description: Install 3/" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: Jason One-Call Ticket: 051528
On-Site: Y
Total Inspection Days: 1
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 94 psi for 15 min
9. OQ Qualifications SAT OPS 800
10. Casio Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Dates in folder
15. EFV Installation SAT OPS 301 EFV 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
IPUC Form 4 Rev. 12/Zv2023
IPUC Construction Inspection
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
-Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pine N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
- Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
-Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli and Brooks observed Das-Co, a contractor for IGC install a 3/'Oservice line in
Boise, ID.
Address: 5316 W Wylie Lane, Boise, Idaho
Observations Include: correct trench depth, line locating, safety equipment, verification of OQ records,
verification of equipment calibrations, tracer wire, butt fusion, EFV installation, successful pressure test
at 94 psi for 15 minutes, stab fitting, bedding and backfill and continuity testing. Quizzed employee on
applicable AOCs of fusion procedures. All procedures were followed in accordance with IGC
Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date: 2/6/2024
Galli
Reviewer: Date:
Brooks
IPUC Form 4 Rev. 12/21/2023