HomeMy WebLinkAboutIntermountain Gas 240205-07 Boise Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 02/05-07/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company(IGC)
Address: 19255 N McCleod Wy City/District: Boise
Contractor/Job#: Foreman: Employees: See Job List
425-117917 German Gomez
Job Description: Install 484' of 2" Service line off System Type: ® Distribution ❑ Transmission
of 4" main
Operator Supervisor: Jason One-Call Ticket: 2024050604
On-Site: Y
Total Inspection Days: 2.5
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 94 PSI for 30 Minutes
9. OQ Qualifications SAT OPS 800 In folder
10. Casio Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping SAT OPS 600 Electro fusion tee
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 All dates in the folder
15. EFV Installation SAT OPS 301 5500
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Purge SAT OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
IPUC Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
-Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Stcel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC installing 450' of 2" service line off of
main in Boise, ID.
Address: 19255 N McCleod Wy
Observations Include: Safety equipment, trenching, boring, pressure test, purging, verification of OQ
records,bedding,back-filling, locating all utilities, and fusing. All procedures were followed in
accordance with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: , Yes No X
Inspector (Lead): Date:
Perkino�<e 2/07/2024
Reviewer: il-- Date: a-�S•�y
Brooks
IPUC Form 4 Re,. 12/21/2023