HomeMy WebLinkAboutIntermountain Gas 240205 Boise Construction IPUC Construction Inspection
Inspector(s): Galli,Brooks Date(s): 02/05/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Compaq (IGC)
Address: 12590 W Franklin Road City/District: Boise
Contractor/Job #: Foreman: Employees: See Job List
117969-425 Jacob Pritt
Job Description: Install %" Service Line System Type: n Distribution ❑ Transmission
Operator Supervisor: Jason One-Call Ticket: 040654
On-Site: N
Total Inspection Days: 2.0 1
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308 Sand used
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O &M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 96 psi for 15 min
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 Pyrometer: 1/8/2025
Pres. Gauge: 1/4/2025
15. EFV Installation SAT OPS 301 EFV pre-installed on
stub
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
IPUC Form 4 Rev. 12/21/2023
IPUC Construction Inspection
20. Line Locating SAT OPS 611
21. Plastic Pine SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pine N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli and Brooks observed Dasco, a contractor for IGC install a V service line from a
2" stub with a reducing stab fitting in Boise, ID.
Address: 12590 W Franklin Road, Boise, ID
Observations Include: correct trench depth, line locating, safety equipment, verification of OQ records,
verification of equipment calibrations, tracer wire, EFV pre-installed on the stub, butt fusion, stab
fittings (2"to V reducer),bedding and backfill. Quizzed employee on applicable AOCs of squeeze off.
Dasco crew needed to cut out a section of pipe that was damaged during the squeeze off. All procedures
were followed in accordance with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date: 02/05/2024
Galli
Reviewer: / 'I
Date:
Brooks
IPUC Form 4 Rev. 12/21/2023