HomeMy WebLinkAboutIntermountain Gas 240131 Soda Springs Construction IPUC Construction Inspection
[Inspector(s): Galli Date(s): 01/31/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company(IGC)
Address: 618 E Hooper Ave City/District: Soda Springs
Contractor/Job#: Foreman: Employees: See Job List
01908-829 Mark Doig
Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: Justin One-Call Ticket: 021537
On-Site: N
Total Inspection Days: 0.5
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308 Bedding with sand
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800
10. Casio Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification N/A OPS 501
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Purge N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607 _
20. Line Locating SAT OPS 611
IPUC Form 4 Rev. 12/2v2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
-Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli observed KV, a contractor for IGC install phase 1 of a 2 phase V PE service line
in Soda Springs, ID. Phase I ended at the street and will be completed when locates are done in the area
adjacent to the street down to the 2"main connection point.
Address: 618 E Hooper Ave, Soda Springs, ID
Observations Include: correct trench depth, safety equipment, tracer wire installation, stab fittings,
bedding and backfill. KV employees were quizzed on applicable AOCs of bedding procedures. All
observed procedures were followed in accordance with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date: 1/31/2024
Galli
Reviewer: Date: -21.1
Brooks
IPUC Form 4 Rev. 12121/2023