HomeMy WebLinkAboutIntermountain Gas 240130 Nampa Construction I PU C Construction Inspection
Inspector(s): Perkins Date(s): 01/30/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: E Railroad St& S Happy Valley Rd City/District: Nampa
Contractor/Job#: Foreman: Employees: See Job List
371-3297 Kyler Oakes
Job Description: Install 400' of 4" PE Main System Type: ® Distribution ❑ Transmission
Operator Supervisor: Mingo One-Call Ticket: 2024030944
On-Site: N
Total Inspection Days: 1.0
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800 In folder
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation N/A OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing N/A OPS 302 _
14. Equipment Calibration Verification SAT OPS 501 All dates in the folder
15. EFV Installation N/A OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT L OPS 611
I P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
-Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Perkins observed Das-Co, a contractor for IGC installing 400' of new 4" PE main line
in Nampa, ID.
Address: E Railroad St& S Happy Valley Rd
Observations Include: Safety equipment, trenching, verification of OQ records, back-filling, locating all
utilities, and fusing. All procedures were followed in accordance with IGC Operations and Maintenance
Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead): Date:
Perkins t,/ L G�ci��!✓f 1/30/2024
Reviewer: Date:
Brooks
IPUC Form 4 Rev. 12/2v2023