HomeMy WebLinkAboutIntermountain Gas 240130 Nampa Construction I PU C Construction Inspection Inspector(s): Perkins Date(s): 01/30/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: E Railroad St& S Happy Valley Rd City/District: Nampa Contractor/Job#: Foreman: Employees: See Job List 371-3297 Kyler Oakes Job Description: Install 400' of 4" PE Main System Type: ® Distribution ❑ Transmission Operator Supervisor: Mingo One-Call Ticket: 2024030944 On-Site: N Total Inspection Days: 1.0 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill SAT OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 In folder 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 _ 14. Equipment Calibration Verification SAT OPS 501 All dates in the folder 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT L OPS 611 I P U C Form 4 Rev. 12/21/2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC installing 400' of new 4" PE main line in Nampa, ID. Address: E Railroad St& S Happy Valley Rd Observations Include: Safety equipment, trenching, verification of OQ records, back-filling, locating all utilities, and fusing. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): Date: Perkins t,/ L G�ci��!✓f 1/30/2024 Reviewer: Date: Brooks IPUC Form 4 Rev. 12/2v2023