HomeMy WebLinkAboutIntermountain Gas 240129 Boise Construction IPUC Construction Inspection
Inspector(s): Perkins/Galli Date(s): 01/29/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company(IGC)
Address: 11222 W Camas City/District: Boise
Contractor/Job#: Foreman: Employees: See Job List
425-3900 I Justin Wilkinson
Job Description: Install '/" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: Jason One-Call Ticket: 2024020105
On-Site: N
Total Inspection Days: 1.5
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308
SF 418
4. Pipe Installation(Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600 _
13. Meter Location/Regulator Testing N/A OPS 302
14. Equipment Calibration Verification SAT OPS 501 All dates in the folder
15. EFV Installation SAT OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line LocatingSAT OPS 611
P U C Form 4 Rev. 12/21/2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
-Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
�B• 0
Additional Comments: £ �g I I i
IPUC inspector Perkindbbserved Das-Co, a contractor for IGC tap off existing line to new garage and
install a 3/' service line in Boise, ID.
Address: 11222 W Camas, Boise Idaho
Observations Include: potholing, line locating, safety equipment, verification of OQ records, back-
filling, locating all utilities, boring, and fusing. All procedures were followed in accordance with IGC
Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date.T Yes No X
Inspector(Lead): , . .= ;,� Date:
Perkin 1/29/2024