HomeMy WebLinkAboutIntermountain Gas 240123-25 Eagle Construction PUC Construction Inspection
Inspector(s): Galli, Brooks Date(s): 01/23-25/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company GC)
Address: 1415 S Hidden Valley Place City/District: Eagle
Contractor/Job #: Foreman: Employees: See Job List
117904-425 Ethan Call
Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: Jason One-Call Ticket: 030720
On-Site: Y 1/24/2024
Total Inspection Days: 5
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill N/A OPS 308
SF 418
4. Pipe Installation(Tracer Wire) N/A OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O & M SAT
8. Testing—Pressure, Duration, Type N/A OPS 505
9. OQ Qualifications SAT OPS 800
10. Casing Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification N/A OPS 501
15. EFV Installation N/A _OPS 301
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Purge N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A I OPS 607
20. Line Locating SAT OPS 611
IPUC Form 4 Rev. 12/2v2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
-Fusion Tools OPS 324
-Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
-Welder(s) Qualified OPS 201
Pipe/Coating-Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
- Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli and Brooks observed Das-Co, a contractor for IGC abandon in place a %Z"PE
service and upgrade to a 3/" PE service line in Eagle, ID.
Address: 1415 S Hidden Valley Place, Eagle, ID
Observations Include: correct trench depth, safety equipment, verification of OQ records,potholing and
boring and installation of a 2" PE sleeve due to poor soil condition. Das-co crew needed to run a new
sleeve due to inaccurate depth measurement on the first bore. All observed procedures were followed in
accordance with IGC Operations and Maintenance Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector(Lead):
G a l l i r� Date: 1/25/2024
- -�� � i"
�l,
Reviewer: Date:
Brooks
IPUC Form 4 Rev. 12/21/2023