HomeMy WebLinkAboutIntermountain Gas 240123-25 Eagle Construction PUC Construction Inspection Inspector(s): Galli, Brooks Date(s): 01/23-25/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company GC) Address: 1415 S Hidden Valley Place City/District: Eagle Contractor/Job #: Foreman: Employees: See Job List 117904-425 Ethan Call Job Description: Install %" Service Line System Type: ® Distribution ❑ Transmission Operator Supervisor: Jason One-Call Ticket: 030720 On-Site: Y 1/24/2024 Total Inspection Days: 5 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification N/A OPS 501 15. EFV Installation N/A _OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Purge N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A I OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. 12/2v2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 324 -Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating-Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli and Brooks observed Das-Co, a contractor for IGC abandon in place a %Z"PE service and upgrade to a 3/" PE service line in Eagle, ID. Address: 1415 S Hidden Valley Place, Eagle, ID Observations Include: correct trench depth, safety equipment, verification of OQ records,potholing and boring and installation of a 2" PE sleeve due to poor soil condition. Das-co crew needed to run a new sleeve due to inaccurate depth measurement on the first bore. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): G a l l i r� Date: 1/25/2024 - -�� � i" �l, Reviewer: Date: Brooks IPUC Form 4 Rev. 12/21/2023