HomeMy WebLinkAboutIntermountain Gas 240104 Nampa.2 Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 01/04/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 3797/3781 W La Brea Dr City/District: Nampa Contractor/Job#: Foreman: Employees: See Job List 047115-413 KC Osmus 047114-413 Job Description: Install%11 service lines System Type: ® Distribution ❑ Transmission Operator Supervisor: Mingo One-Call Ticket: 520716/520712 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure# Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. BeddingBackfill SAT OPS 308 SF 418 4. Pipe Installation (Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type SAT OPS 505 95 psi 15 minutes 9. OQ Qualifications SAT OPS 800 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation SAT OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing N/A OPS 302 14. Equipment Calibration Verification SAT OPS 501 Dates/Pics in file 15. EFV Installation SAT OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pmjj e SAT OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 P U C Form 4 Rev. 12/21/2023 IPUC Construction Inspection 20. Line Locating SAT OPS 611 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC install 3/a' service lines in Nampa, ID. Address: 3 797/3 781 W La Brea Dr Observations Include: line locating, safety equipment, verification of OQ records, trenching, service- line/EFV install,pressure testing, fusing,back-filling. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): � Date: Perkins 1/4/2024 Reviewer: Brooks Date: P U C Form 4 Rev. 12/21/2023