Inspector(s): Galli Date(s): 01/04/2024
Company/Owner: Unit/OPID: 08160
Intermountain Gas Company (IGC)
Address: 4653 E Fortuna Dr City/District: Nampa
4623 & 4637 E Musselshell Dr
Contractor/Job#: Foreman: Employees: See Job List
49103-371, 52117-371, Jose Maceda
49118-371
Job Description: Install%'1 Service Line System Type: ® Distribution ❑ Transmission
Operator Supervisor: John One-Call Ticket: 520302, 520305, 520304
On-Site: Y
Total Inspection Days: 1
Tasks: Rating Critical Procedure# Comments
1. Materials—Handling, Storage, SAT OPS 11
Labeling _
2. Trenching/Boring—Depth, Clearance SAT OPS 308
OPS 322
3. Bedding/Backfill SAT OPS 308 Sand used
SF 418
4. Pipe Installation (Tracer Wire) SAT OPS 308
OPS 322
5. Valve Installation N/A OPS 703
6. Coating Condition N/A OPS 401
OPS 403
7. Manuals—Field Procedures, O &M SAT
8. Testing—Pressure, Duration, Type SAT OPS 505 94 psi for 15 minutes
9. OQ Qualifications SAT OPS 800
10. Casio Seal/Installation N/A OPS 325
11. Service Line Installation SAT OPS 302
12. Tie-In/Hot Tapping N/A OPS 600
13. Meter Location/Regulator Testing SAT OPS 302
14. Equipment Calibration Verification SAT OPS 501 See pictures
15. EFV Installation SAT OPS 301 EFV 1200
16. MAOP N/A OPS 602
OPS 606
OPS 900
OPS 1000
17. Pure N/A OPS 603
18. Safety Equipment SAT SF 418
SF 422
19. Abandonment N/A OPS 607
20. Line Locating SAT OPS 611
I P U C Form 4 Rev. 12/2 v2023
IPUC Construction Inspection
21. Plastic Pipe SAT OPS 307
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 324
- Heat Plate OPS 325
- Joining Procedure OPS 800
22. Steel Pipe N/A OPS 200
- Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
4800
Additional Comments:
IPUC inspector Galli observed Das-Co, a contractor for IGC install a%' service line in Nampa, ID.
Address: 2653 E Fortuna Dr,Nampa, ID
Observations Include: correct trench depth, safety equipment, verification of OQ records, verification of
equipment calibrations, tracer wire, EFV 1200 installation,butt fusion, stab fittings (couplers and T's),
successful pressure test,bedding with sand and backfill and continuity testing. Quizzed employee on
applicable ADCs of fusion and squeeze off procedures. All observed procedures were followed in
accordance with IGC Operations and Maintenance Manual.
Address: 4623 &4637 E Musselshell Dr,Nampa, ID
Observations Include: correct trench depth, line locating, safety equipment, verification of OQ records,
verification of equipment calibrations, tracer wire, EFV 1200 installation,butt fusion,bedding with
sand. All observed procedures were followed in accordance with IGC Operations and Maintenance
Manual.
Corrective Action Required: Yes No X
Follow-up Required: By Date: Yes No X
Inspector (Lead):
� Date: 1/4/2024
Galli
Reviewer:
Brooks i' Date: