HomeMy WebLinkAboutIntermountain Gas 240103 Boise Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 01/03/2024 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Address: 1801 N 18th St City/District: Boise Contractor/Job#: Foreman: Employees: See Job List 02267-425 German Gomez Job Description: Abandonment of service line System Type: ® Distribution ❑ Transmission Operator Supervisor: Jason One-Call Ticket: 50190 On-Site: N Total Inspection Days: 1 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) N/A OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casio Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Re lator Testin N/A OPS 302 14. Equipment Calibration Verification N/A OPS 501 15. EFV Installation N/A OPS 301 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure SAT OPS 603 __Purged abandoned line 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment SAT OPS 607 Abandon 3/4" ald 1-a 20. Line Locating SAT OPS 611 IPUC Form 4 Rev.12/2v2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Perkins observed Das-Co, a contractor for IGC install a 3/4' service line in Boise, ID. Address: 1801N 18t' St, Boise Idaho Observations Include: potholing, line locating, safety equipment, verification of OQ records, install repair tapping tee over top of aldyl-a tee (IGC),purging of abandoned line, filled both ends with spray foam,back-filling, removal of old house meter. All procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector(Lead): �- Date: Perkins 1/3/2024 Reviewer: _ Date: I_8-0- Brooks IPUC Form 4 Rev. 12/2v2023