Loading...
HomeMy WebLinkAboutIntermountain Gas 240411 IPUC Form 1 - IGC Incident Follow Up Idaho PUC Pipeline Safety Inspection Summary Inspector(s):I Brooks, Perkins Date(s): 4/11/2024 Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type & Time (1 day, 0.5 day) Total Inspection Days: 1 Standard: Training: Integrity Management: Incident: 1 Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A field incident evaluation was performed to identify the status and nature of an incident significant in the eyes of Intermountain Gas Company. IGC reported at 1155 on 4-11-2024 that a washout on Highway 16 (Freeze Out Hill)had occurred and exposed the 6" Steel H.P. Main approximately 6' from the edge of the highway. Idaho Transportation Department(ITD)had been onsite and evaluating the conditions after substantial recent rainfall and discovered the exposed piping. There was an estimated length of 10' of the pipeline exposed. During the field evaluation and follow up, ITD and IGC engineering were communicating and working together for a mitigation plan. Daily monitoring was to be performed by IGC for the pipeline itself and soil conditions. Email correspondence was made with IGC compliance personnel to request the repair work schedule so that IPUC could attempt to be on-site for the mitigation and associated repair work as available. IGC Contacts - K.Peterson, C. Lundstrom, D. Hood Corrective Action Required: Yesi No I X Follow-up Required: by(date): Yesi No I X Inspector (Lead): Date: 4/16/2024 Brooks Reviewer: / Date: Brooks IPUC Form 1