HomeMy WebLinkAboutIntermountain Gas 240129-240201 OQ Training Pocatello Idaho PUC Pipeline Safety Inspection Summary
Inspector(s):I Galli Date(s): 01/30-31/202
Company/Owner: Intermountain Gas Company(IGC) Unit#/OPID 8160
Inspection Type & Time 1 day, 0.5 day)_777 Total Inspection Days:12.5
Standard: Training: (T)(D)Integrity Management: Incident:
Follow-up: I OQ: 12.51 Damage Prevention: D&A:
Inspection Summary
An OQ training inspection was performed on IGC personnel at the IGC Pocatello Office.
January 29, 2024 (0.5 Travel)
Traveled to Pocatello district
January 30, 2024 (1.0 OQ)
Galli observed IGC crews at the Pocatello District Office conducting annual classroom and practical
training of met-fit installations, electrofusion(T's and Couplings), stab fittings, saddle T's and butt
fusions. Personnel recognized applicable AOCs.
January 31, 2024 (0.5 OQ)
Galli observed IGC service technicians at the Pocatello District Office conducting annual classroom and
practical training of met-fit installations, stab fittings and saddle T's. Personnel recognized applicable
ADCs.
February 1, 2024 (0.5 Travel)
Traveled back to Boise
Corrective Action Required: Yesl I No I X
Follow-up Required: by(date): Yesl I Nol X
Inspector (Lead_):
Date:
Galli 2/l/2024
Reviewer:
Brooks Date:_F
. ��•�
1 PUC Form 1