Loading...
HomeMy WebLinkAboutIntermountain Gas 2024 IPUC Form 1 - Nampa Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Brooks, Galli Date(s): 4/8-10/2024 Company/Owner: I Intermountain Gas Company(IGC) Unit#/OPID 18160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 6 Standard: 1 6 1 Training: (T)(D) Integrity Management: Incident: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Audit consisted of IPUC inspectors Perkins,Brooks and Galli inspecting field installed equipment for the Nampa,Idaho inspection units.The PHMSA IA question set and IGC equipment listing were used as a guide throughout the audit to ensure all areas were completed/covered. April 8 &9,2024: (2.0 Standard MG)(1.0 Standard JB)(2.0 Standard BP) Met with IGC company representatives in the Nampa district office for in-brief and to begin field audit and review OQ records for all personnel taking part in the inspection. Regulator Stations: 15 regulator stations were inspected for proper operation, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings,pipe-to soil interface wrap protection, station warning signs and right-of-way clearances. 10 casing-to-carrier isolation checks, 5 cathodic protection rectifiers, 13 pipeline patrols, 14 emergency/isolation valves and 32 HPSSs were checked for proper operation, observations listed below. IPUC inspectors observed regulator stations 48371-RS-1289867 (Primary Fail/Dithiazine), 48371-RS-59980 (Primary Fail/Oil), 48371-RS-59992 (Primary Fail), 48371-RS-59977 (Secondary Fail/Weld Slag), 48371-RS- 59976 (Primary Fail/Tap Shavings). Valve 48371-VLV-32835 and 48371-VLV-32786, work order created to be flushed and greased and identifed as 2-man valve as needed. 48371-HPSS-66671 needs vehicle protection secured and replace a carsonite. An exit interview was performed following the district inspection with field personnel of Intermountain Gas Company and District Operations Manager. April 10,2024: (1.0 Standard Post/Completed MG/BP) Completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post-Inspection Preliminary Written Findings, attached inspection documents and wrote NOPV 1202405 Attached: IPUC Form 1, Preliminary Written Findings,Field Equipment Work Sheets Corrective Action Required: 1202405 NOPV Yes X No Follow-up Required: by(date): 5/31/2024 Yes X No Inspector(Lead): Date: 4/10/2024 Galli Reviewer: Date: 4/10/2024 Brooks IPUC Form 1