Loading...
HomeMy WebLinkAboutNorthwest Gas Processing 2024 IPUC Form 1 - NWGP Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): lBrooks, Galli Date(s):8/27/2024 Company/Owner: I Northwest Gas Processing (NWGP) Unit#/OPID 139370 Inspection Type&Time (1 day,0.5 day) Total Inspection Days: 2 Standard: 1 2 Training: (T)(D) Integrity Management: Incident: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary Audit consisted of IPUC inspectors Brooks and Galli inspecting field installed operating equipment for the NWGP inspection unit in New Plymouth,ID. August 27,2024(2.0 Standard) Met with Northwest Gas Processing contracted representative to audit the companies field audit. Following the audit an lA exit interview was conducted with Randy Shelton, Shelton Consulting and Nate Caldwell, Snake River Oil and Gas. 1 rectifier and 12 isolation control valves were inspected. No discrepancies were found. Attached: IPUC Form 1, Field Equipment Work Sheets, Operator Qualifications Corrective Action Required: Yes Nol X Follow-up Required: by (date): Yes I Nol X Inspector (Lead): G a l l i �_�- �_ Date: 8/27/2024 Reviewer: Date: $-a„�•�.y Brooks IPUC Form 1