Loading...
HomeMy WebLinkAboutAvista 240610-14 CDA Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 10-14 Jun 2024 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: See Below City/District: CDA Contractor/Job #: Foreman: See daily job Employees: See OQ's in file See Below listings Job Description: See descriptions System Type: Distribution Operator Supervisor: One-Call Ticket: Are listed below On-Site: N Total Inspection Days: 5 Tasks: Ratin Critical Procedure# Comments 1. Materials-Handling, Storage, Labeling SAT 3.12-3.13 2. Trenching/Boring -Depth, Clearance SAT 3.15 3. Beddin Backfill SAT 3.15 4. Pipe Installation Tracer Wire SAT 3.13 5. Valve Installation N/A 2.14 6. Coating Condition N/A 2.12 7. Manuals-Field Procedures, O & M SAT 1.4 8. Testing-Pressure, Duration, Tye SAT 2.12-13/3.18 100 PSI. 9. OQ Qualifications SAT 4.31 10. Casing Seal/Installation N/A 3.42 11. Service Line Installation SAT 3.16 12. Tie-In/Hot Tapping SAT 3.32 Plastic tapping tee 13. Meter Location/Regulator Testing N/A 2.22 14. Equipment Calibration Verification SAT 5.11 14,21 In File 15. EFV Installation SAT 3.16 16. MAOP N/A 4.15 17. Pure SAT 3.17 18. Safety Equipment SAT 19. Abandonment N/A 5.16 20. Line Locating SAT 4.13 21. Plastic Pipe SAT 3.23,24,25 - Joiner(s) Qualified - Fusion Tools - Heat Plate - Joining Procedure IPUC Form 4 Rev. 1212112023 IPUC Construction Inspection 22. Steel Pipe N/A 3.22 - Welder(s) Qualified - Pipe/Coating Inspected/Repaired - Cathodic Protection - Non-Destructive Testing - Welding Procedures Additional Comments: - 10 Jun 2024, traveled to CDA Idaho for new construction. -I I Jun 2024, Witnessed NPL personnel install V service lines to 22140 N Ceylon Rd & 297 W. Sliderock Ct, Rathdrum. Observations included, lyco fittings, bedding/covering as it was a customer " provided trench, pressure testing, purging, tapping tee, tracer wire/locate ball/anode. Locate tickets are 241550008/241550010, Project#1031731807/1031861306. Foreman is Brandon Morris, other personnel are Dillion Plaster and Lance Roberg. - 12 Jun 2024, Witnessed Avista personnel replace CP test point by installing new Fink post at 4397 W Boekel Rd in Rathdrum. Observation included, trenching, building Fink post, installing new wiring and Backfilling. Crew located/removed lost missile at road crossing at 8732 N Meter Rd. Personnel did not follow Idaho Dig Line rules as they dug within 4" of V service line with mini excavator. Observation included, checking service line for knicks/scratches, trenching, line locating, and backfilling. Locate tickets were 245180082/241580083, Project# 1031073924/1031072413. Foreman is Ed Berg, other personnel are Ryan Sager, and Robert Miller. -13 Jun 2024, Witnessed NPL personnel install 2" service line and 3/" service stubs to 6201 W. Sparrowhawk Dr, Rathdrum. Observations included, lyco fittings, bedding/covering as it was a customer provided trench,pressure testing, purging, tapping tee, and tracer wire/locate ball/anode. Locate ticket is 241550003, Project# 1031273203. Foreman is Brandon Morris, other personnel are Dillion Plaster and Lance Roberg. -14 Jun 2024, traveled back to Boise and completed paperwork. Corrective Action Required: Yes INo IX FoRow-up Required: By Date: I Yes No I X Inspector (Lead): Date:6/14/24 Perkins Reviewer: Brooks Date: ( - IPUC Form 4 Rev. 1212112023