HomeMy WebLinkAboutAvista 240311-13 CDA Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 11-14 Mar 2024 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: W Hanley Ave/N Carrington Ln/Gas City/District: CDA Trail 61h Add/Rounds Contractor/Job #: Foreman: Les Huber &:' Employees: See OQ's in file 1027287422 Doug Basenberg Job Description: Install and bed 4" main/2" System Type: Distribution backbone and V service stubs for future subdivision. Operator Supervisor: One-Call Ticket: N/A On-Site: N Total Inspection Days: 4 Tasks: Rating Critical Procedure# Comments 1. Materials-Handling, Storage, Labeling SAT 3.12-3.13 2. Trenching/Boring -Depth, Clearance SAT 3.15 3. Beddin Backfill SAT 3.15 Pics/video in file 4. Pipe Installation(Tracer Wire) SAT 3.13 5. Valve Installation N/A 2.14 6. Coating Condition N/A A 2.12 7. Manuals-Field Procedures, O &M SAT 1.4 8. Testing-Pressure, Duration, Type SAT 2.12-13/3.18 100 PSI for 18 hrs 9. OQ Qualifications SAT 4.31 10. Casing Seal/Installation N/A 3.42 11. Service Line Installation SAT 3.16 12. Tie-In/Hot Tapping N/A 3.32 13. Meter Location/Regulator Testing N/A 2.22 14. Equipment Calibration Verification SAT 5.11,14,21 In File 15. EFV Installation N/A 3.16 16. MAOP N/A 4.15 17. Pure SAT 3.17 18. Safety Equipment SAT 19. Abandonment N/A 5.16 20. Line Locating SAT 4.13 21. Plastic Pipe SAT 3.23,24,25 - Joiner(s) Qualified - Fusion Tools - Heat Plate - Joining Procedure IPUC Form 4 Rev. 1212112023 IPUC Construction Inspection 22. Steel Pine N/A 3.22 - Welder(s) Qualified - Pipe/Coating Inspected/Repaired - Cathodic Protection -Non-Destructive Testing - Welding Procedures Additional Comments: - 11 Mar 2024, traveled to CDA Idaho for new construction, witnessed Avista personnel install and bed 4"main/2"backbone and 3/" service stubs for future subdivision. - 12 Mar 2024, Witnessed Avista personnel bedding 2000' for 4"main/2"backbone. Purged and pressure tested all for 18 hours -13 Mar 2024, Witnessed Avista personnel shading 4"main/2"backbone and 3/" service stubs, also installed 2 fink posts, curb valve and anode tie-in on locating wire. -14 Mar 2024, traveled back to Boise and completed paperwork. Corrective Action Required: Yes No X FoRow-up Required: By Date: Yes No X Inspector (Lead): / / Perkins �� Date:'3 Reviewer: Brooks Date: .,),6. IPUCi Form 4 Rev. 1212112023