Loading...
HomeMy WebLinkAboutAvista 240212-15 Lewiston Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 12-15 Feb 2024 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: loth & Powers, 711 & 15 and 151h & City/District: Lewiston Alder Contractor/Job #: Foreman: Mitch Blake Employees: See OQ's in file 1027344853, NPL, Daniel Dach 100268923 Avista Job Description: Abandoned t/" Aldyl-A System Type: Distribution to 6 services and install :/" PE services, abandoned 1550' of 2" Aldy-A, Tied in 2" steel main to 2" PE mains when Aldy-A piping was removed. Operator Supervisor: One-Call Ticket: 2024030348, 2024030375 On-Site: Mitch Blake NPL, Daniel Dach Avista Total Inspection Days: 5 Tasks: Rating Critical Procedure# Comments 1. Materials-Handling, Storage, Labeling SAT 3.12-3.13 2. Trenching/Boring -Depth, Clearance SAT 3.15 3. Beddin Backfill SAT 3.15 4. Pipe Installation(Tracer Wire) SAT 3.13 5. Valve Installation NA 2.14 6. Coating Condition SAT 2.12 7. Manuals-Field Procedures, O & M SAT 1.4 8. Testing-Pressure, Duration, Type SAT 2.12-13/3.18 9. OQ Qualifications SAT 4.31 10. Casing Seal/Installation NA 3.42 11. Service Line Installation SAT 3.16 12. Tie-In/Hot Tapping SAT 3.32 13. Meter Location/Regulator Testing NA 2.22 14. Equipment Calibration Verification SAT 5.11,14,21 15. EFV Installation SAT 3.16 16. MAOP NA 4.15 17. Pure SAT 3.17 18. Safety Equipment SAT 19. Abandonment SAT 5.16 20. Line Locating SAT 4.13 21. Plastic Pipe SAT 3 - Joiner(s) Qualified - Fusion Tools - Heat Plate .23,24,25 - Joining Procedure IPUC Form 4 Rev. 1212112023 IPUC Construction Inspection 22. Steel Pipe SAT 3.22 - Welder(s) Qualified -Pipe/Coating Inspected/Repaired - Cathodic Protection -Non-Destructive Testing - Welding Procedures Additional Comments: - 12 Feb 2024, Traveled to Lewiston Idaho for new construction, witnessed NPL personnel abandoning '/2"Aldyl-A services and installing V PE services,potholing, utility locating,bedding, and back-filling to 6 houses on 1 Oth Ave. - 13 Feb 2024, Witnessed NPL personnel abandoning 1550' of 2"Aldy-A, flaring,potholing, bedding, and backfilling. Witnessed Avista personnel welding on 2" steel main transition fitting to 2" PE main, hot tapping, abandoning 15' of Aldyl-A, wax wrapping, cad welding tracer wires to steel line, blowdowns, and electro fusing on Powers & 16th Ave. -14 Feb 2024, Witnessed NPL personnel pot holing, boring, back filling and utility locating at 7"' and 15th near the port of Lewiston. -15 Feb 2024, Witnessed Avista personnel weld in 2" steel main transition to 2" PE main. Welded on 2" transition fittings, hot tapping, abandoning 2"Aldyl-A, wax wrapping, blowdowns, electro fused steel transition fitting to PE and lyco fittings to 1 Oth St E & Powers Ave and Alder Dr and 151h St. -16 Feb 2024, Traveled back to Boise and completed paperwork. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes No X Inspector (Lead): �� Date: i1Oz Perkin � 7, Reviewer: Date: Brooks IPUC Form 4 Rev. 1212112023