Loading...
HomeMy WebLinkAboutAvista 240612 IPUC Form 1 - Kellogg Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Brooks, Galli Date(s): 6/12/2024 Company/Owner: jAvista Utilities Unit#/OPID 131232 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 4.5 Standard: 4.5 Training: (T)(D)Integrity Management: Incident: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary Audit consisted of IPUC inspectors Brooks and Galli inspecting field installed operating equipment for the Avista Kellogg inspection unit. June 12,2024: (2.0 Standard) Met with Avista company representatives at the Kellogg district office for a briefing,reviewed emergency manual, crossings,past year work order and began field audit of Kellogg installed equipment. 7 regulator stations were inspected for relief operation,regulator lock-up, general condition of the station including pipe-to-soil wrap, and cathodic protection. Four rectifiers, three carrier-to-casings, one test station, one patrol and fifteen valves were also inspected. June 13,2024: (2.0 Standard Travel) Traveled back to Boise. June 18,2024: (0.5 Standard Post) Wrote inspection report, completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post-Inspection Preliminary Written Findings and attached inspection documents. Attached: IPUC Form 1, Field Equipment Work Sheets, Operator Qualifications Corrective Action Required: Yes I No X Follow-up Required: by (date):', Yes I No X Inspector(Lead): Date: 6/12/2024 Galli l Reviewer: Brooks _7Date: IPUC Form 1