Loading...
HomeMy WebLinkAboutAvista 240506-8 IPUC Form 1 - Moscow Field Idaho PUC Pipeline Safety Inspection Summary inspector(s): I Perkins, Brooks Date(s): 5/06-08/2024 Company/Owner: jAvista Utilities Unit#/OPID 131232 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 6 Standard: 1 6 1 Training: (T)(D) Integrity Management: incident: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Audit consisted of IPUC inspectors Perkins and Brooks inspecting field installed operating equipment for the Avista Moscow inspection unit. May 6,2024: (2.0 Standard Travel) Traveled to Moscow, ID to conduct field inspection. May 7, 2024: (2.0 Standard) Met with Avista company representatives in the Pullman, Washington(Moscow) district office for a briefing, reviewed welding records,past year work orders and began field audit of Moscow installed equipment. 11 regulator stations were inspected for relief operation, regulator lock-up, general condition of the station including pipe-to-soil wrap, and cathodic protection. 14 EOP/Emerg Valves were checked for operation and ease of turn. 1 Carrier/Casing at Howell &HWY 8 to check reading to ensure they were not grounded. May 8,2024: (2.0 Standard Travel/Post/Compliance) Wrote inspection report, completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post-Inspection Preliminary Written Findings and attached inspection documents.Traveled back to Boise. Conducted brief fireside meeting regarding compliance items and potential PHMSA agreement change. Attached: IPUC Form 1,Field Equipment Work Sheets, Operator Qualifications Corrective Action Required: Yes I I Nol X Follow-up Required: by (date): Yes I Nol X inspector (Lead): Date: l Perkins 7/ 4 Reviewer: Date: Brooks IPUC Form 1