HomeMy WebLinkAboutI202404 NOPV Response EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707• (208)377-6000• FAX:377-6097 April 17,2024 Mr.Jeff Brooks,Programs Manager Idaho Public Utility Commission PO Box 83720 Boise,ID 83720-0074 Subject:Response to the Notice of Probable Violation dated March 11,2024(Report#I202404) Dear Mr.Brooks, This letter is intended to address one(1)notice of probable violation stemming from a construction inspection conducted by the Idaho Public Utilities Commission(IPUC)on March 7,2024,on project 371-3065 of Intermountain Gas Company(IGC). PROBABLE VIOLATION 1. 49 CFR$ 192,605 Procedural manual for operations.maintenance.and emergencies. (a) General. Each operator shall prepare and follow for each pipeline, a manual of written procedures for conducting operations and maintenance activities and for emergency response.For transmission lines,the manual must also include procedures for handling abnormal operations.This manual must be reviewed and updated by the operator at intervals not exceeding 15 months,but at least once each calendar year.This manual must be prepared before operations of a pipeline system commence.Appropriate parts of the manual must be kept at locations where operations and maintenance activities are conducted. OPS 308 Gas Joint and Provided Trench Installations 1.4.Joint trench pipelines shall be installed in an approved trench configuration and with the minimum separation shown in Appendices 1-12.Joint trench configurations may vary with the addition or exclusion of other utilities.The selected joint trench configuration shall meet the requirements of the utilities sharing the trench and easement,city,county,or state requirements. 1.4.1.Unless approved by Engineering Services or System Integrity,the following are the minimum separation distances of utilities exiting a joint trench(e.g.,horizontal/perpendicular crossings: 1.4.1.2.Plastic main or service crossing electric installed in conduit or communications(direct bury or in conduit)is four(4")inches. Finding(s)• At 5143 W Canaston St,in Meridian,when installing a service line,personnel did not leave the minimum required separation of 4"between the service line and electrical line(in conduit)as required by OPS 308. Intermountain Gas Response IGC acknowledges the findings brought forth by the IPUC.Das-Co returned to 5143 W Canaston St in Meridian on March 7, 2024, and excavated the service line. Upon exposing the service line, the separation from the electric service, in conduit,was discovered to be four inches. Prior to backfilling, Das-Co adjusted the service line to create approximately seven inches of separation. Please contact Josh Sanders at(701)222-7773 with questions or comments. Respectfully Submitted, Pat Darras Vice President,Engineering&Operations Services Intermountain Gas Company