Loading...
HomeMy WebLinkAboutIntermountain Gas 231212 IGC Caldwell Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 12/12/2023 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company IGC Address: 501 S Kit Ave City/District: Caldwell Contractor/Job#: Foreman: Employee: See Lineup 051974-317 Jesus Garcia Job Description: 1/4" Service Lines Circle: Distribution Operator Supervisor: Joe One-Call Ticket: 471419 On-Site: No Total Inspection Days: 1 Tasks: Rating Critical Procedure # Comments 1. Materials—Handling, Storage, SAT OPS 11 Labeling 2. Trenching/Boring—Depth, Clearance SAT OPS 308 OPS 322 3. Bedding/Backfill N/A OPS 308 SF 418 4. Pipe Installation(Tracer Wire) SAT OPS 308 OPS 322 5. Valve Installation N/A OPS 703 6. Coating Condition N/A OPS 401 OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type N/A OPS 505 9. OQ Qualifications SAT OPS 800 10. Casing Seal/Installation N/A OPS 325 11. Service Line Installation N/A OPS 302 12. Tie-In/Hot Tapping N/A OPS 600 13. Meter Location/Regulator Testing SAT OPS 302 14. Equipment Calibration Verification SAT OPS 501 Pyrometer: See pics Pressure Gauge: See pics 15. EFV Installation SAT OPS 301 EFV 1200 16. MAOP N/A OPS 602 OPS 606 OPS 900 OPS 1000 17. Pure N/A OPS 603 18. Safety Equipment SAT SF 418 SF 422 19. Abandonment N/A OPS 607 20. Line Locating SAT OPS 611 IPUC Form 4 Rev. April 2023 IPUC Construction Inspection 21. Plastic Pipe SAT OPS 307 - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 324 - Heat Plate OPS 325 - Joining Procedure OPS 800 22. Steel Pipe N/A OPS 200 - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 4800 Additional Comments: IPUC inspector Galli observed Dasco, a contractor for IGC install a 1/" service line from a 4"Aldyl-A pipe. Address: 501 S Kit Ave, Caldwell, ID Observations Include: correct trench depth, line locating, safety equipment, tracer wire, verification of equipment calibrations, stab fitting and saddle T installation. Quizzed employees on applicable AOCs of fusion and saddle T procedures. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: Yes No X Follow-up Required: By Date: Yes Not X Inspector (Lead): Date: 12/12/2023 Galli N" Reviewer: T Date: I 3 Brooks �, IPUC Form 4 Rev. April 2023