September 24, 2024
Monica Barrios-Sanchez
Commission Secretary
Idaho Public Utilities Commission
11331 W. Chinden Blvd.
Bldg. 8, Ste. 201-A
Boise, ID 83714
monica.barrio ssanchez(apuc.Idaho.gov
S ecretarygpuc.idaho.gov
RE: ID PAC-E-24-04
IPUC Set 11 (205-216)
Please find enclosed Rocky Mountain Power's 1st Supplemental Response to IPUC I Ith Set Data
Request 212.
If you have any questions, please feel free to call me at (801)220-2313.
Sincerely,
/s/
Mark Alder
Manager, Regulation
Enclosures
C.c.: Eric L. Olsen/IIPA elo(-,echohawk.com(C)
Lance Kaufman/IIPA lance(&aegisinsi hg t.com(C)
Matthew Nykiel/ICL matthew.nykiel&gmail.com
Brad Heusinkveld/ICL bheusinkveld(&idahoconservation.org
Thomas J. Budge/Bayer tj racineolson.com(C)
Brian C. Collins/Bayer bcollins(cr�,consultbai.com
Greg Meyer/Bayer gmeyerkconsultbai.com
Kevin Higgins/Bayer khiggins(&energystrat.com(C)
Neal Townsend/Bayer ntownsend(a,energystrat.com (C)
Ronald L. Williams/PIIC rwilliams(&hawleytroxell.com
Brandon Helgeson/PIIC bhel eg sonkhawleytroxell.com
Bradley Mullins/PIIC brmullins&mwanal)tics.com
Val Steiner/PIIC val.steiner(&itafos.com
Kyle Williams/PIIC williamskkbyui.edu
PAC-E-24-04/Rocky Mountain Power
September 24, 2024
IPUC Data Request 212 - 15t Supplemental
IPUC Data Request 212
From the Company's Response to Production Request No. 55, "Staff Attachment
55-2" (attached as Attachment No. 1) lists projects under $5 million for Wildfire
projects. Please answer the following questions in regards to the projects listed in
"Staff Attachment 55-2":
(a) Please explain what the term"Mandated Wildfire Mitigation" means. Please
explain if each project with this term is mandated by a certain state or by the
Company
(b) For each project with the term"Mandated Wildfire Mitigation" in project
description, please provide location of the project, narrative of the project, in-
service date, and any benefits to Idaho customers.
(c) For each project with"Damage Repair", "Damage Rebuild", "Damaged
Facilities", "Fire Damage" and "Fire Restoration" in the project description,
please explain the cause of the damage, any associated names of the fire and
the fire start date, the scope of the project, total project cost and if the
Company expects any insurance funds for the project.
(d) For Ref#134 "RMP 2023 ID Fire Mitigation Vehicles", please provide a list
of vehicles purchased, price, purpose, date and invoices.
(e) For Ref#79 "RMP 2023 UT Fire Mitigation Vehicles", Ref#211 "RMP 2022
UT Fire Mitigation Vehicles", Ref#531 "FHCA - 2021 UT Wildfire
Vehicles", please provide a list of each vehicle purchased, price,purpose, date
and invoices. Additionally, please explain how these costs were allocated to
Idaho.
(f) For Ref#580 "RMP 2023 WY Fire Mitigation Vehicles", please provide a list
of each vehicles purchased, price, purpose, date and invoices. Additionally,
please explain how these costs were allocated to Idaho.
(g) For Ref#1705 "Purchase Firefighting Equipment", please provide a list of the
equipment purchased, quantity, purpose, and cost of each item. Additionally,
please explain how these costs were allocated to Idaho.
1"Supplemental Response to IPUC Data Request 212
Further to the Company's response to IPUC Data Request 212 dated September 9,
2024, the Company provides the following listing of the allocation of costs
responsive to subparts (e), (f) and (g).
PAC-E-24-04/Rocky Mountain Power
September 24, 2024
IPUC Data Request 212 - 15t Supplemental
(e) Please refer to the Company's response to subpart (e) below:
• Ref#79 "RMP 2023 UT Fire Mitigation Vehicles"was booked to FERC
Plant Account 1064000 General Completed Construction Not Classified
and is allocated using the system overhead(SO) allocation factor.
When projects are closed and placed in-service, project costs are often
tentatively capitalized to, or recorded under, FERC Account 106
(Completed construction not classified-electric) assuming a functional
category based on the broad functional category of work that the project
pertains and without a state-specific location code. Allocation factors are
assigned based on a combination of the FERC Plant account and location
code. Since there is no state-specific location code associated with the
FERC Account 106 accounting entry, a default SO allocation factor is
assigned to the plant function general plant. Over time, the Company
performs a more detailed analysis of amounts placed in-service to transfer
balances out of FERC Account 106 and into the appropriate electric plant
accounts within FERC Account 101, with a specific location code. When
the FERC Account and location code are recorded, the proper allocation is
assigned. At the time this general rate case (GRC) filing was made, the
analysis for final plant account and location determination had not been
performed on all in-service plant balances.
• Ref#211 "RMP 2022 UT Fire Mitigation Vehicles"—The 2022 amount of
$11,978 was booked to FERC Plant Account 3921400 Snowmobiles-
Motorcycles (4-Wheeled Atv). The cost is allocated situs to Utah. The
2023 amount of$938,642 was booked to FERC Plant Account 1064000
General Completed Construction Not Classified and is allocated using the
SO allocation factor.
• Ref#531 "FHCA - 2021 UT Wildfire Vehicles"—The 2022 amount of
$359,033 was booked to FERC Plant Accounts 3920900 Trailers, and
3920500 1 Ton And Above- Two-Axle Trucks. The cost is allocated situs
to Utah. The 2023 amount of$3,326 was booked to FERC Plant Account
3920500 1 Ton And Above- Two-Axle Trucks. The cost is allocated situs
to Utah.
(f) Ref#580"RMP 2023 WY Fire Mitigation Vehicles"was booked to FERC
Plant Account 1064000 General Completed Construction Not Classified and
is allocated using the SO allocation factor.
(g) Ref#1705 "Purchase Firefighting Equipment"was booked to FERC Plant
Account 1064000 Production Completed Construction Not Classified and is
allocated using the system generation (SG) allocation factor.
PAC-E-24-04/Rocky Mountain Power
September 24, 2024
IPUC Data Request 212 - 15t Supplemental
Recordholder: Craig Larsen
Sponsor: Shelley McCoy