Loading...
HomeMy WebLinkAbout20240913PAC to Bayer 53.pdf RECEIVED Friday, September 13, 2024 IDAHO PUBLIC UTILITIES COMMISSION _ ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP 1407 W North Temple, Suite 330 Salt Lake City, Utah 84116 September 13, 2024 Thomas J. Budge ti(&racineolson.com(C) Brian C. Collins bcollins(&consultbai.com Greg Meyer gmeyerkconsultbai.com Kevin Higgins khiggins(c�r�,energystrat.com(C) Neal Townsend ntownsendkenergystrat.com(C) RE: ID PAC-E-24-04 Bayer Set 3 (49-56) Please find enclosed Rocky Mountain Power's Response to Bayer 3rd Set Data Request 53. Provided via BOX are Confidential Attachments Bayer 53-1 and 53-2. Confidential information is provided subject to protection under IDAPA 31.01.01.067 and 31.01.01.233, the Idaho Public Utilities Commission's Rules of Procedure No. 67—Information Exempt from Public Review, and further subject to the non-disclosure agreement (NDA) executed in this proceeding. If you have any questions, please feel free to call me at (801)220-2313. Sincerely, /s/ Mark Alder Manager, Regulation Enclosures C.c.: Eric L. Olsen/IIPA elo cr,echohawk.com(C) Lance Kaufman/IIPA lance(&aegisinsi hg t.com(C) Matthew Nykiel/ICL matthew.n,ielkamail.com Brad Heusinkveld/ICL bheusinkveldkidahoconservation.org Ronald L. Williams/PIIC rwilliamskhawleytroxell.com Brandon Helgeson/PIIC bhel eg songhawleytroxell.com Bradley Mullins/PIIC brmullins(a�mwanalytics.com Val Steiner/PIIC val.steinerha,itafos.com Kyle Williams/PIIC williamsk(&byui.edu Monica Barrios-Sanchez/IPUC monica.barriossanchez(c puc.idaho.gov SecretM(a puc.Idaho.gov PAC-E-24-04/Rocky Mountain Power September 13, 2024 Bayer Data Request 53 Bayer Data Request 53 Gateway Transmission Projects: Please refer to RMP witness Rick Link's work papers, specifically the file "Link Workpaper- Table 3 Detail CONF". (a) For each of the"Cost of Project" line items under each price-policy scenario, please confirm whether or not the annual amount shown for each year reflects a levelized revenue requirement amount. (b) For any line item identified in subpart (a) above that reflects a levelized annual amount, please provide a work paper showing the non-levelized annual amount and the calculations used to derive the levelized annual amount. Please provide the work paper(s) in Excel format with all formulas intact. Response to Bayer Data Request 53 Please refer to Confidential Attachment Bayer 53-2 which provides the work papers supporting this data request response. (a) Please refer to Confidential Attachment Bayer 53-1, specifically the tab "Identification", which provides the levelization status of each line item, and a reference to the supporting work papers that support the line item. Column E identifies how the production tax credits (PTC) and associated obligations were incorrectly categorized in certain line items. In addition to this error, some price-policy scenarios categorized part of the cost for Anticline, Boswell, and Two Rivers in 2034 as part of the "Change in System Fixed Cost" line item instead of the "PPA" column. After correctly categorizing these items, the present value of revenue requirements differential (PVRR(d)) reported for each price-policy scenario was unchanged. Tab "Table 3 —Corrected" of Confidential Attachment Bayer 53-1 reports corrected values for each line item. Tab "Table 3 —Correction Impacts" displays the difference in the value of each line item between the original and corrected table. (b) Tab "Table 3 —Nominal" of Confidential Attachment Bayer 53-1 reports nominal, non-levelized values for each cost of project line item. Tab "Delta Nominal less Corrected" displays the difference in the value of each line item between the nominal and corrected tables. For additional detail on the wind projects, nominal costs and calculations used to derive the levelized annual amounts are included in the "Bid Templates CONF"folder and confidential file "WY RFP FSL ST Costs CONF.xlsx". The non-levelized transmission costs are included on tab "GWS Transmission" of the files within confidential folder"ST Cost Summaries CONF", along with calculations used to derive the levelized annual amounts. PAC-E-24-04/Rocky Mountain Power September 13, 2024 Bayer Data Request 53 Column C of Confidential Attachment Bayer 53-1 identifies the work papers supporting each line item. The files within confidential folder"ST Cost Summaries CONF" display itemized details that flow through to the tables featured in Confidential Attachment Bayer 53-1. The five files within confidential folder"ST Cost Summaries CONF" labeled"CORRECTED" provide corrected calculations and support tab "Table 3 - Corrected". The "Bid Templates CONF" folder provides the bid details received for the six wind projects associated with Energy Gateway South and provides the calculations used to derive the levelized annual amounts used in the confidential folder"ST Cost Summaries CONF" files. Confidential information is provided subject to protection under IDAPA 31.01.01.067 and 31.01.01.233, the Idaho Public Utilities Commission's Rules of Procedure No. 67—Information Exempt from Public Review, and further subject to the Non-Disclosure Agreement(NDA) executed in this proceeding. Recordholder: Samuel Zacharia Sponsor: Rick Link Joe Dallas (ISB# 10330) Rocky Mountain Power 825 NE Multnomah, Suite 2000 Portland, OR 97232 Telephone: 3 60-5 60-193 7 Email:joseph.dallas@pacificorp.com Attorney for Rocky Mountain Power BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. PAC-E-24-04 IN THE MATTER OF THE ) APPLICATION OF ROCKY ) ATTORNEY'S CERTIFICATE MOUNTAIN POWER FOR ) CLAIM OF CONFIDENTIALITY AUTHORITY TO INCREASE ITS ) RELATING TO DISCOVERY RATES AND CHARGES IN IDAHO ) RESPONSES AND APPROVAL OF PROPOSED ) ELECTRIC SERVICE SCHEDULES ) AND REGULATIONS ) I, Joe Dallas, represent Rocky Mountain Power in the above captioned matter. I am a attorney for Rocky Mountain Power. I make this certification and claim of confidentiality regarding the response to the attached Idaho Public Utilities Commission Staff discovery request pursuant to IDAPA 31.01.01 because Rocky Mountain Power, through its response,is disclosing certain information that is Confidential and/or constitutes Trade Secrets as defined by Idaho Code Section 74-101, et seq. and 48-801 and protected under IDAPA 31.01.01.067 and 31.01.01.233. Specifically, Rocky Mountain Power asserts that the its response to Bayer Data Request No. 53 contains Company proprietary information that could be used to its commercial disadvantage. 1 Rocky Mountain Power herein asserts that the aforementioned responses contain confidential information that the information contains Company proprietary information. I am of the opinion that this information is "Confidential," as defined by Idaho Code Section 74-101, et seq. and 48-801, and should therefore be protected from public inspection, examination and copying, and should be utilized only in accordance with the terms of the Protective Agreement in this proceeding. DATED this 13th day of September, 2024. Respectfully submitted, By Joe Dallas Attorney Rocky Mountain Power 2