Loading...
HomeMy WebLinkAbout20240912IPC to Staff 116 - Attachment Addendum No 2.pdf ADDENDUM NO. 02 2023 Wilson Butte Structural and Control TO: All Prospective Respondents  RE: Request for Bid – Zycus Event #1319897553  The following items are addressed in this Addendum No. 02:  1. Attachments:  Foundation Design Report File: 111125 ‐ Wilson Butte Station_t1 ISSUED 05‐23‐2023.pdf  WBUT210001 2023‐09‐20 3.jpeg  WBUT210001 2023‐09‐20 10.jpeg  Light Pole Base.pdf  2. Submitted Questions & Answers:    1. Will all Precast Plastibeton Trench be provided by IPC? Answer:Yes 2. We have a question regarding the yard light precast foundation, in drawing 21D-11371 Foundation Schedule mentions a detailed drawing for the yard light precast foundation but can’t seem to find it in the package. Is there any info regarding this foundation? Answer: Please see the attached light pole base.pdf. Drawing 79368-1 has this detail as well. 3. Can a Geotech report be provided? Answer: Please see the Foundation Design Report File. File name above under Attachments. 4. Can the power transformer delivery date please be clarified in order to incorporate and account for on the contractors submited proposal schedule? Answer: Currently set for deliver in 3/19/24 – 3/22/24 5. Would IPC construction crew tasks (i.e., power transformer, line work, etc.) and associated projected completion dates/milestones please be provided to incorporate and account for on the contractors submitted proposal schedule? Remove transformer 1/2 /24 – 1/5/24  Install new transformer 3/18-3/22 Line construction (IPC) –1/8 – 2/1 (tentative schedule) 6. How many hours and/or days should the contractor include/account for in the Schedule of Values “Testing and Commissioning Support” line item? What tasks, dates and/or project milestones should the support be accounted for on the contractors submitted proposal schedule? T Answer: Test/commissioning will be ongoing even during construction. It is expected that commissioning to take place between 3/11 – 4/29.     An IDACORP Company QIL.I' -" r ~ ~1 1.1'-1 ~ I Q .r-1 "'"' ~Vf'LI ..... r~ 'i;.r. 6 1E 59812. 1 PRECAST [2.1-78495~ YA RD LIGH T ADDENDUM NO. 02 2023 Wilson Butte Structural and Control Respondent shall provide acknowledgement of this Addendum No. 02 within the Zycus event. Failure to provide  such acknowledgement may render the bid as non‐responsive and subject to rejection.      An IDACORP Company