Inspector(s): Perkins Date(s): 30 Jun-1 Jul 20
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) Total Inspection Days:1 'L
Standard: Construction:F2 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
30 June-1 Jul 2020: (1.0 Construction)
Observed a Das-co crew install new 6" main east down State St off Hwy 16 Reg station, Eagle, Idaho.
Approximately 600'trench/bore. All procedures were followed.Typed up report
Areas observed during this project were: Excavating, line locating, fusing, pot holing, boring, pipe lowering,
bedding/backfilling.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X1 by(date):
Inspector (Lead): Date:
Bruce Perkins ✓ C 7/1/2020
Reviewer: Date:
Dar in Ulmer