Loading...
HomeMy WebLinkAboutIntermountain Gas Jun-Jul Eagle Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 30 Jun-1 Jul 20 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days:1 'L Standard: Construction:F2 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 30 June-1 Jul 2020: (1.0 Construction) Observed a Das-co crew install new 6" main east down State St off Hwy 16 Reg station, Eagle, Idaho. Approximately 600'trench/bore. All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, fusing, pot holing, boring, pipe lowering, bedding/backfilling. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X1 by(date): Inspector (Lead): Date: Bruce Perkins ✓ C 7/1/2020 Reviewer: Date: Dar in Ulmer IPUC Form 1