HomeMy WebLinkAboutIntermountain Gas 31 Jan Emmett Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 31-Jan-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days: 1
StandardT-1 Construction: � Training: F7 (T)(D) Integrity Management: Incident: F7
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
34 Jan 2020: (1.0 Construction)
Observed a Das-co crew locating/exposing a 3/" stub, trenching, installing meter bar and constructing
riser. Typed up report
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yesi No X
Yes No X by(date):
Inspector (Lead): Date:
Bruce Perkins 1/31/2020
Reviewer: I Ll Y Date:
�6 „2G,zo