HomeMy WebLinkAboutIntermountain Gas 31 Jan Emmett Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 31-Jan-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 StandardT-1 Construction: � Training: F7 (T)(D) Integrity Management: Incident: F7 M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 34 Jan 2020: (1.0 Construction) Observed a Das-co crew locating/exposing a 3/" stub, trenching, installing meter bar and constructing riser. Typed up report Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yesi No X Yes No X by(date): Inspector (Lead): Date: Bruce Perkins 1/31/2020 Reviewer: I Ll Y Date: �6 „2G,zo IPUC Form 1