HomeMy WebLinkAboutIntermountain Gas 30 Jan Eagle Construction Idaho PUC Pipeline Safety Inspection Summary
Inspectors): I Perkins I Date(s): 30-Jan-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
Standard:F—] Construction: FI Training: F—] (T)(D)Integrity Management: Incident:
M/M: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
30 Jan 2020: (1.0 Construction)
Observed a Das-co crew locating/exposing a 3/" stub, installing meter bar, installed EFV and a tee for
an additional home, pressure testing and backfilling. Typed up report
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
YesF71 No X - by(date):
Inspector (Lead): Date:
Bruce Perkins 1/30/2020
Reviewer: Date:
31 �j(xvi lei
IPUC Form 1