Loading...
HomeMy WebLinkAboutIntermountain Gas 30 Jan Eagle Construction Idaho PUC Pipeline Safety Inspection Summary Inspectors): I Perkins I Date(s): 30-Jan-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 1 Standard:F—] Construction: FI Training: F—] (T)(D)Integrity Management: Incident: M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 30 Jan 2020: (1.0 Construction) Observed a Das-co crew locating/exposing a 3/" stub, installing meter bar, installed EFV and a tee for an additional home, pressure testing and backfilling. Typed up report Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X YesF71 No X - by(date): Inspector (Lead): Date: Bruce Perkins 1/30/2020 Reviewer: Date: 31 �j(xvi lei IPUC Form 1