HomeMy WebLinkAboutIntermountain Gas 29-30 Sep Boise Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 29-30 Sep 2020
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days:1 2
Standard:F-] Construction: F2 Training: F7 (T)(D) Integrity Management: 71 Incident:
M/M: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company and IGC
personnel tapping crew.
29-30 Sep 2020: (2.0 Construction)
Observed a Das-co crew extending a 4" steel main at 33400 Orchard Access, Boise, Idaho. IGC personnel
tapped the main on 30 September 2020. All procedures were followed.Typed up report.
Areas observed during this project were: Excavating, line locating, welding, EFV installation, material handling,
backfilling/bedding,jeeping, coating repair and line tapping.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No
Yes No X by (date):
Inspector (Lead): Date:
Bruce Perkins 9/30/2020
Reviewer: Date:
Darrin Ulmer
IPUC Form 1