Loading...
HomeMy WebLinkAboutIntermountain Gas 29-30 Sep Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 29-30 Sep 2020 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days:1 2 Standard:F-] Construction: F2 Training: F7 (T)(D) Integrity Management: 71 Incident: M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company and IGC personnel tapping crew. 29-30 Sep 2020: (2.0 Construction) Observed a Das-co crew extending a 4" steel main at 33400 Orchard Access, Boise, Idaho. IGC personnel tapped the main on 30 September 2020. All procedures were followed.Typed up report. Areas observed during this project were: Excavating, line locating, welding, EFV installation, material handling, backfilling/bedding,jeeping, coating repair and line tapping. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No Yes No X by (date): Inspector (Lead): Date: Bruce Perkins 9/30/2020 Reviewer: Date: Darrin Ulmer IPUC Form 1