Loading...
HomeMy WebLinkAboutIntermountain Gas 29 Oct Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 29-Oct-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type&Time (1 day) Total Inspection Days: 1 Standard: ConstructionT_11 Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 29 Oct 2020: (1.0 Construction) Observed a Das-co crew tapping a 4" main and installing a new W service line at 12172 W Savage Dr Boise, Idaho. All procedures were followed.Typed up report. Areas observed during this project were: Excavating, line locating, saddle/tapping T install, EFV install, riser install and purging. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of Job ticket. Corrective Action Required: Follow-up Required: Yes No X Yes NoF X by(date): Inspector (Lead): If Date: Bruce Perkins 10/29/2020 Reviewer: Date: Darrin Ulmer IPUC Form 1