HomeMy WebLinkAboutIntermountain Gas 29 Jan Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins 11 Date(s): 29-Jan-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
Standard: Construction:� Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Track, a contractor for Intermountain Gas Company.
29 Jan 2020: (1.0 Construction)
Observed a Track crew butt fusing 2ea 2"Tees, installing 3ea 2" bolt on saddles, and backfilling and
bedding gas line in a joint trench. Typed up report
Attachments:
IPUC Form 4 Construction Inspections
Track Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector (Lead): Date:
Bruce Perkins 1/29/2020
Reviewer: Date:
IPUC Form 1