Loading...
HomeMy WebLinkAboutIntermountain Gas 29 Jan Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins 11 Date(s): 29-Jan-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 1 Standard: Construction:� Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Track, a contractor for Intermountain Gas Company. 29 Jan 2020: (1.0 Construction) Observed a Track crew butt fusing 2ea 2"Tees, installing 3ea 2" bolt on saddles, and backfilling and bedding gas line in a joint trench. Typed up report Attachments: IPUC Form 4 Construction Inspections Track Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): Date: Bruce Perkins 1/29/2020 Reviewer: Date: IPUC Form 1