HomeMy WebLinkAboutIntermountain Gas 28-29 Dec Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins/Brooks I Date(s): 28-29 Dec 202
Company/Owner: Intermountain Gas Unit/OPID: 8i6o
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4
Standard: Construction:a4 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company
28-29 December 2020 (4.0) construction)
Observed a Das-co crew installing new 2" service line at 16570 Northside Blvd, Nampa, Idaho. All procedures
were followed.Typed up report.
Areas observed during this project were: traffic control, line locating, trenching, boring, pot-holing, installing
riser, met-fit/continental fittings, blowing pigs, bedding/backfill,verified OQ's
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily iteneraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of job ticket.
Corrective Action Required: Yes No X
Follow-up Required: by(date): Yes No X
Inspector(Lead): Date:
Bruce Perkins 29-Dec-20.10
Reviewer: Date:
Darrin Ulmer
IPUC Form 1