Loading...
HomeMy WebLinkAboutIntermountain Gas 28-29 Dec Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Brooks I Date(s): 28-29 Dec 202 Company/Owner: Intermountain Gas Unit/OPID: 8i6o Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4 Standard: Construction:a4 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-Co, a contractor for Intermountain Gas Company 28-29 December 2020 (4.0) construction) Observed a Das-co crew installing new 2" service line at 16570 Northside Blvd, Nampa, Idaho. All procedures were followed.Typed up report. Areas observed during this project were: traffic control, line locating, trenching, boring, pot-holing, installing riser, met-fit/continental fittings, blowing pigs, bedding/backfill,verified OQ's Attachments: IPUC Form 4 Construction Inspections Das-co daily iteneraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of job ticket. Corrective Action Required: Yes No X Follow-up Required: by(date): Yes No X Inspector(Lead): Date: Bruce Perkins 29-Dec-20.10 Reviewer: Date: Darrin Ulmer IPUC Form 1