HomeMy WebLinkAboutIntermountain Gas 28 Oct Meridian Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins I Date(s): 28-Oct-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
StandardT—1 Construction:� Training: F7 (T)(D) Integrity Management: Incident:
M/M: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
28 Oct 2020: (1.0 Construction)
Observed a Das-co crew installing a new W service lines at 4413/4429/4443/4459 W Sunny Cove, Meridian,
Idaho. All procedures were followed.Typed up report.
Areas observed during this project were: Excavating, line locating, pressure testing, EFV install,
bedding/backfilling, riser install and purging
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of Job ticket.
Corrective Action Required: Follow-up Required: Yes No X
Yes No fE
by(date):
Inspector (Lead): , Date:
Bruce Perkins 10/28/2020
Reviewer: Date:
Darrin Ulmer o C� ¢�
IPUC Form 1