Loading...
HomeMy WebLinkAboutIntermountain Gas 28 Oct Meridian Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 28-Oct-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 1 StandardT—1 Construction:� Training: F7 (T)(D) Integrity Management: Incident: M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 28 Oct 2020: (1.0 Construction) Observed a Das-co crew installing a new W service lines at 4413/4429/4443/4459 W Sunny Cove, Meridian, Idaho. All procedures were followed.Typed up report. Areas observed during this project were: Excavating, line locating, pressure testing, EFV install, bedding/backfilling, riser install and purging Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of Job ticket. Corrective Action Required: Follow-up Required: Yes No X Yes No fE by(date): Inspector (Lead): , Date: Bruce Perkins 10/28/2020 Reviewer: Date: Darrin Ulmer o C� ¢� IPUC Form 1