HomeMy WebLinkAboutIntermountain Gas 28 May Kuna Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): I 28-May-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
Standard:F-I Construction:FI Training: F-] (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: a Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
28 May 2020: (.5 Construction, .5 typed report)
Observed a Dasco crew Installing new W service line 2102 W Soldotna St, Kuna Idaho. All procedures were
followed.Typed up report
Areas observed during this project were: Excavating, line locating, bedding,backfilling, pressure testing and EFV
installation/testing.
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
YesF7 No X by(date):
Inspector (Lead): Date:
Bruce Perkins 5/28/2020
Reviewer: Date:
Darrin Ulmer apao
IPUC Form 1