Loading...
HomeMy WebLinkAboutIntermountain Gas 28 May Kuna Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): I 28-May-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 1 Standard:F-I Construction:FI Training: F-] (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: a Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 28 May 2020: (.5 Construction, .5 typed report) Observed a Dasco crew Installing new W service line 2102 W Soldotna St, Kuna Idaho. All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, bedding,backfilling, pressure testing and EFV installation/testing. Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X YesF7 No X by(date): Inspector (Lead): Date: Bruce Perkins 5/28/2020 Reviewer: Date: Darrin Ulmer apao IPUC Form 1