Loading...
HomeMy WebLinkAboutIntermountain Gas 27 Oct Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 27-Oct-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 Standard:= Construction:FTI Training: (T)(D)Integrity Management: Incident: M/M: F7 Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 27 Oct 2020: (1.0 Construction) Observed a Das-co crew installing a new 2" main using met fit couplings and %" service line at 1115 N Whitley Dr Nampa, Idaho. All procedures were followed.Typed up report Areas observed during this project were: Excavating, met fit couplings, line locating, pressure testing, EFV install, bedding/backfilling, riser install and purging Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of Job ticket. Corrective Action Required: Follow-up Required: Yesi No X Yes NoF X by (date): Inspector (Lead): Ile, Date: Bruce Perkins 10/27/2020 Reviewer: Date: Darrin Ulmer IPUC Form 1