HomeMy WebLinkAboutIntermountain Gas 27 Oct Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins Date(s): 27-Oct-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days: 1
Standard:= Construction:FTI Training: (T)(D)Integrity Management: Incident:
M/M: F7 Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
27 Oct 2020: (1.0 Construction)
Observed a Das-co crew installing a new 2" main using met fit couplings and %" service line at 1115 N Whitley
Dr Nampa, Idaho. All procedures were followed.Typed up report
Areas observed during this project were: Excavating, met fit couplings, line locating, pressure testing, EFV
install, bedding/backfilling, riser install and purging
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of Job ticket.
Corrective Action Required: Follow-up Required: Yesi No X
Yes NoF X by (date):
Inspector (Lead): Ile, Date:
Bruce Perkins 10/27/2020
Reviewer: Date:
Darrin Ulmer
IPUC Form 1