Loading...
HomeMy WebLinkAboutIntermountain Gas 27 May Eagle Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins Date(s): 27-May-20 Company/Owner: Intermountain Gas Company Unit/OPID: T 8-160 Inspection Type &Time (1 day) I Total Inspection Days:1 1 Standard:FI Construction:� Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 27 May 2020: (.5 Construction, .5 typed report) Observed a Dasco crew Installing new W service lines to two different homes at 2593&2647 E Bonita Hills Eagle, Idaho All procedures were followed.Typed up report Areas observed during this project were: Excavating, line locating, bedding,backfilling, installing saddle tee, pressure testing and EFV installation/testing. Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector(Lead): i' ;' Date: Bruce Perkins 5/27/2020 Reviewer: Date: Darrin Ulmer o27 IPUC Form 1