Loading...
HomeMy WebLinkAboutIntermountain Gas 27 Jan Boise Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 27-Jan-20 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) Total Inspection Days: 1 Standard:F7 Construction: FI Training: F7 (T)(D) Integrity Management: =1 Incident: F7 M/M: = Follow-up: OQ: F-1 Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 27 Jan 2020: (1.0 Construction) Observed a Dasco crew locating, excavating, installing EFV, pressure testing, backfilling/bedding and tying in 2 new services. Typed up report Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yesi No X Yes No FX_1 by (date): Inspector (Lead): " Date: Bruce Perkins` - l 1/27/2020 Reviewer: T IL 1,�9 Date: i n IPUC Form 1