Inspector(s): I Perkins I Date(s): 27-Jan-20
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 1
Standard:F7 Construction: FI Training: F7 (T)(D) Integrity Management: =1 Incident: F7
M/M: = Follow-up: OQ: F-1 Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
27 Jan 2020: (1.0 Construction)
Observed a Dasco crew locating, excavating, installing EFV, pressure testing, backfilling/bedding and
tying in 2 new services. Typed up report
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yesi No X
Yes No FX_1 by (date):
Inspector (Lead): " Date:
Bruce Perkins` - l 1/27/2020