HomeMy WebLinkAboutIntermountain Gas 26 Aug Nampa Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins I Date(s): 26-Aug-2-0 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type&Time (1 day) I Total Inspection Days: 1 Standard: Construction:71 1 Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co and Track, contractors for Intermountain Gas Company. 26 Aug 2020: (.5 Construction) Observed a Das-co crew installing W main to 11685 W Alyxandra, Nampa Idaho. All procedures were followed. Typed up report. Areas observed during this project were: Excavating, line locating, plastic pipe joining, pressure testing, bedding/backfilling. 26 Aug 2020: (.5 Construction) Observed a Track Utilities crew installing 2" mains and 3/4" stubs at Midway and Lake Lowell intersection, Nampa, Idaho. Additionally a separate crew was doing the backfilling for a joint utilities trench to include 2" mains.All procedures were followed.Typed up report. Areas observed during this project were: Fusing, installing 2"-3/4" saddle tees and bedding/backfilling trenches. Attachments: IPUC Form 4 Construction Inspections Das-co daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Pictures of Job tickets. Corrective Action Required: Follow-up Required: Yes No Yes No X by(date): Inspector(Lead): Date: Bruce Perkins A 8/26/2020 Reviewer: 4_ QWDate: Darrin Ulmer Diu �y. IPUC Form 1