HomeMy WebLinkAboutIntermountain Gas 26 Aug Nampa Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins I Date(s): 26-Aug-2-0
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type&Time (1 day) I Total Inspection Days: 1
Standard: Construction:71 1 Training: (T)(D) Integrity Management: Incident:
M/M: Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co and Track, contractors for Intermountain Gas Company.
26 Aug 2020: (.5 Construction)
Observed a Das-co crew installing W main to 11685 W Alyxandra, Nampa Idaho. All procedures were followed.
Typed up report.
Areas observed during this project were: Excavating, line locating, plastic pipe joining, pressure testing,
bedding/backfilling.
26 Aug 2020: (.5 Construction)
Observed a Track Utilities crew installing 2" mains and 3/4" stubs at Midway and Lake Lowell intersection,
Nampa, Idaho. Additionally a separate crew was doing the backfilling for a joint utilities trench to include 2"
mains.All procedures were followed.Typed up report.
Areas observed during this project were: Fusing, installing 2"-3/4" saddle tees and bedding/backfilling trenches.
Attachments:
IPUC Form 4 Construction Inspections
Das-co daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Pictures of Job tickets.
Corrective Action Required: Follow-up Required: Yes No
Yes No X by(date):
Inspector(Lead): Date:
Bruce Perkins A 8/26/2020
Reviewer: 4_ QWDate:
Darrin Ulmer Diu �y.
IPUC Form 1